Our most recent achievements

IGA Mont-Saint-Hilaire

ACHIEVEMENT 2020/2021

Traffic area and parking for heavy goods vehicles

Mont-Saint-Hilaire

Area : 16 000 m³ 
Quantity : 25 MPa to 55 MPa.

Ciment Québec

REALIZATION IN JULY 2002

Traffic area and parking for heavy goods vehicles

Cimenterie St-Basile-de-Portneuf

Area : 9 390 m² (or 101 075 pi²)
Thickness : 275 mm (or 11 po)
Quantity : 2 900 m³ of RCC concrete applied in 4 days

Intersection of highways 15 and 30

REALIZATION IN JUNE 2009 & OCTOBER 2010

Testing of RCC concrete for roads by the Ministère des Transports du Québec (MTQ)

Delson-Candiac sector

Project carried out in 2 phases with a specialized paver and with a fixed table 8 meters wide.

June 2009:

Area: 2 432 m² (or 26 178 ft²)

Thickness: 250 mm (or 10 in)

Quantity: 636 m³ of concrete executed in 1 day

Special feature: Expansion joints every 5 linear meters without dowels

October 2010:

Area: 800 m² (or 8 611 ft²)

Thickness: 250 mm (or 10 in)

Quantity: 228 m³ of concrete executed in 1 day

Particularity: Expansion joints every 5 linear meters with dowels

Securing the St. Lawrence

REALIZATION IN OCTOBER 2007

Quebec: Steel scrap handling and storage area

Area: 12 168 m² (or 130 975 ft²)

Thickness: 300 mm (or 12 in applied in 1 coat)

Quantity: 3 663 m³ of RCC concrete placed in 3 days with two Pugmill mobile plants

Production rate: ± 250 m3 per hour

Sobey

REALIZATION IN JULY 2011

Traffic area for heavy trucks

Terrebonne Distribution Center

Area: 65 063 m² (or 700 330 ft²)

Thickness: 175 mm (or 7 in)

Quantity: 11 953 m³ of RCC concrete applied in 15 days

Centrale nucléaire Gentilly-2

Infrastructure slab for anti-seismic protection to avoid the spillage of nuclear residues from the modules of anti-seismic reinforced concrete canstors

Quantity: 43 500 m³ of RCC concrete applied in 15 days

Special feature: 2 Pugmill mobile plants for continuous BCR production (24 hours, seven days a week)

Production rate: ± 250 m3 per hour